Laywright

Commercial & residential flooring

Every layer.
Every dollar.

Laywright runs a flooring company from the slab up. Every scan, probe and pull becomes proof, and every problem under the floor becomes a priced change order.

The floor is your company. Tap a layer or a label to open it.

Teal = within limit · Amber = near the limit · Red = overRH = relative humidity

05 Wear layer · protects everything

Money

Retainage, change orders and lien deadlines across every job.

At risk right now

Retainage held (released later) $33,781.50 On 3 commercial jobs. Utah caps retainage at 5% on nonresidential work (13-8-5).

Deadlines Utah rules, tracked per job

  • Preliminary noticeLarkspur Market · File by Fri 20 Nov · 2 daysLegal deadline Sun 22 Nov · 20 days from first work on 2 Nov (38-1a-501)falls on a Sunday · file by Fri 20 Nov (a weekend deadline rolls to Mon 23 Nov, 68-3-7)
    2days
  • Retainage releaseGranger & Stoll · window ends 14 Dec45 days after the latest of final billing, final acceptance, occupancy, or final pay quantities (30 Oct) · 13-8-5
    26days
  • Lien deadlineGranger & Stoll · 21 Apr 2027180 days from completion on 23 Oct (38-1a-502)
    154days

Change orders waiting $18,090.00

  • CO-07
    Floor prep · Larkspur MarketDrafted from the Area 4 laser scan · sent 14 Nov
    $6,840.00
  • CO-02
    Moisture mitigation · Summit RidgeApproved by phone · not signed yet
    $11,250.00

04 Finish · what the client sees

Jobs

Every floor in progress, by material, area and percent laid.

3jobs on the floor today
59,400sq ft in progress
$1.156Munder contract on them

Field tools for the finish

Larkspur Market$412,600.00
Porcelain 24×48LVTGrocery · Area 3 of 7
18,400 sq ft62% laid
Area 3 waiting on GC sign-off · CO-07 unsigned
Summit Ridge Hotel$596,400.00
Carpet tilePorcelainHospitality · Level 2–3
31,200 sq ft18% laid
Flood test 17 h 40 min of 24 h · CO-02 not signed
Aspen Grove Residences$147,000.00
Solid white oak · 5 in plankBuilder · residential
9,800 sq ft55% laid
Acclimation ready to install
Granger & Stoll Offices$268,900.00
LVTCarpet tileOffice
22,600 sq ftComplete · retainage pending
Retainage release 14 Dec · 2 closeout items open

03 Setting bed · what holds it together

Crew

Who's where today, what they're certified for, what they're owed, and what OSHA requires for them.

10people on the crew
3jobs staffed today
2certified tile installers

On site right now 6 of the 10

  • HR
    Héctor RuizCertified Tile Installer
    Larkspur
    Area 3
  • MV
    Marisol VegaLead installer · LVT
    Larkspur
    Area 2
  • KA
    Kalani AkanaHelper
    Larkspur
    Area 3
  • TN
    Tuan NguyenTile setter
    Respirator 27 of 30 days
    Exam booked Fri 20 Nov
  • AW
    Andre WilsonCarpet tile
    Summit Ridge
    Level 3
  • DP
    Dale PetersenHardwood
    Aspen Grove
    Bldg C

NTCA Five Star 2 of 3 tile setters certified · 67%

Commercial work · at least 10%Crew mix meets Residential work · at least 30%Crew mix meets

Counts Certified Tile Installers and DOL-approved setters; helpers excluded. The program also requires $150k residential / $500k commercial annual volume.

Silica, handled on the crew's phone

Wet saws and the Table 1 controls are checked off each day. Anyone who wears a respirator 30 or more days a year needs a medical exam, so Tuan's exam is booked for Fri 20 Nov, before day 30 (Mon 23 Nov).

OSHA 29 CFR 1926.1153
Piece-rate overtime, worked out for you

For crews on piece rate, each hour over 40 earns an extra half of the regular rate, and the regular rate is the week's piece pay divided by the hours worked.

29 CFR 778.111

02 Membrane · the proof underneath

Records

Every job builds its own defense file while the crew works, so a callback or a claim meets proof instead of a shrug.

Defense file · Larkspur Market Auto-built

18laser scans
41probe readings
27coverage pulls
9joint checks
312cartons scanned
1,284photos

Closeout · Granger & Stoll 4 of 6

67%
  • As-built floor planDone
  • Maintenance guideDone
  • Warranty registeredDone
  • Final lien waiverDone
  • Attic stock deliveredOpen
  • GC punch-list sign-offOpen
Warranty clocks start themselves

LATICRETE's 10-year system warranty needs a written claim within 30 days of discovery. Laywright starts that clock the day a problem is logged.

LATICRETE DS 230.10

01 Slab · where every floor starts

Start gate

Larkspur Market · Area 3 · sales floor · 24×48 porcelain · 4,800 sq ft. Nothing gets laid until all five are green. Waiting on you or the GC shows in amber.

Field kit · on the

Laser flatness

Scan the slab before a tile goes down. Anything over the limit becomes a priced change order with the proof attached.

Flatness over 10 ftLimit 1/8″
3/32″Pass
Flatness over 24 inLimit 1/16″
1/32″Pass
Within limitNear the limitOver the limit
Why this pays for itself

The tile sets the tolerance: ANSI A108.02 allows 1/8″ in 10 ft for tile with any edge 15″ or longer. A dated scan, sent with the change order before any prep starts, records the slab exactly as it was handed over, so the prep is priced up front instead of argued about after the tile is down.

ANSI A108.02

Field kit · in the

Moisture probes

Relative humidity inside the slab, logged the way ASTM F2170 requires and checked against the product's own limit.

7probes for 4,800 sq ft
1.6″deep · 40% of a 4″ slab
24 hto equilibrate before reading

Readings · 18 Nov, 7:42 am 85% limit (product data sheet)

P178%
P281%
P376%
P483%
P579%
P680%
P777%
85% limit85%

The limit comes from the product's data sheet (85% in this example). P4 sits near the exterior wall and is flagged for a retest before the membrane goes down.

The test the standard actually asks for

Three probes for the first 1,000 sq ft and one more for each additional 1,000, set at 40% of the slab's depth when it dries from the top, and read after 24 hours. Laywright counts the probes, times the wait and stores every reading.

ASTM F2170

Field kit · under the

Coverage pull

Pull a tile, photograph the back, and Laywright measures how much of it the mortar actually touched.

91.7%average
  • Pull 1 · grid C-492%
  • Pull 2 · grid D-694%
  • Pull 3 · grid B-289%
  • Corners fully supportedYes
  • Interior dry floor · limit 80%Pass
The rule behind it

ANSI A108.5 calls for at least 80% average mortar contact, and 95% for showers and exteriors, judged by pulling at least three tiles. TCNA guidance adds 95% for other wet areas and natural stone. Hollow tile is among the most common tile complaints, and this record shows the coverage was there when it went down.

ANSI A108.5 · TCNA guidance

Field kit · through the

Movement joints

The joints that keep tile from tenting, laid out by the rule and checked off by the crew.

80 ft 60 ft 20 ft open
Perimeter joint, ¼″ minimumDone Field joints laid out at 20 ft5 Placed and photographed4 of 5 Still openLine at 40 ft
The rule behind it

Indoors, a field joint every 20 to 25 ft in each direction; every 8 to 12 ft outdoors or where the floor sits in direct sun, plus joints at the perimeter and wherever the plane changes. Missing joints are a top cause of tented tile.

TCNA EJ171

Field kit · before the

Lot scan & acclimation

Every carton scanned on delivery, every plank checked before it goes down. Mixed lots get caught on the pallet, not on the floor.

47cartons scanned · Larkspur
46on lot 2241-B, shade 03
1on 2241-C, set aside

Shade and size vary between production lots, so tile is ordered and laid from one lot. The odd carton never reaches the floor.

Acclimation · Aspen Grove Solid white oak · 5″ plank

Subfloor moisture8.4% Flooring moisture7.1% Difference · limit 2% for plank 3″ and wider1.3%
Ready to install
The rule behind it

For solid wood, the subfloor should be no more than 4% wetter than strip flooring under 3″ wide, and no more than 2% wetter than plank 3″ and wider.

NWFA Installation Guidelines

Field kit · on the

Flood test

Every shower pan proven watertight before tile covers it, with the clock and the photos to show it.

17:40of 24 h
Room 214 · Summit Ridge HotelFilled 17 Nov at 2:20 pm · level steady · start photo loggedPasses at 2:20 pm today if the level holds

Level 2 shower pans 4 passed · 1 running · 19 to go

The rule behind it

A flood test runs for at least 24 hours and no more than 72. Laywright starts the clock when the pan is filled and asks for the closing photo when it's done.

ASTM D5957

Studio Owner only · applies to every seat

Built the way you lay floors.

Choose your trades and tools, set the standards your crews work to, and decide who approves what. Every change flows to the Office and Crew seats.

Studio14 of 14 tools onAll changes saved

Morning brief Wed 18 Nov · 8:00 am

Good morning, Garrett.

Your managers, every job’s money and what needs you, before the trucks roll.